A basement job runs around the heating system and the space you have.
Heat during the job
Is the boiler still keeping the house warm? Then you, your heating contractor and our crew settle when it goes off before any plastic goes up.
A clear path
Boxes and shelves near the pipe runs or the basement stairs should be cleared first. The enclosure takes up floor space, and sealed bags have to travel out without obstacles.
Air tests at the end
Air samples are taken before the plastic comes down. You get the lab report with the rest of the job paperwork.